WELCOME

Welcome to Ningbo Demo Machinery Co., Ltd.

We are glad to have you here.

Products

View all products →

Cases

Generator fleet, Saudi Arabia

Generator fleet, Saudi Arabia

Six silent gensets supplied for a remote construction camp, with on-site commissioning and a two-year spare-parts packag

Client: Al-Fajr ContractingMarket: Saudi Arabia
Injection moulding, Vietnam

Injection moulding, Vietnam

Twelve servo machines installed for a consumer-goods factory, cutting energy consumption by 28% against their old fleet.

Client: Vina Precision Co.Market: Vietnam
Packaging line, Poland

Packaging line, Poland

A complete flow-wrapping and cartoning line for a snack producer, with EU-conformity documentation and local training.

Client: SnackLine Sp. z o.o.Market: Poland
CNC cell, Turkey

CNC cell, Turkey

Eight VMC-850 centres arranged into an automated cell with a robot loader, commissioned and handed over in three weeks.

Client: Makina Sanayi A.S.Market: Turkey

View all cases →

FAQ

What voltage and frequency do machines support?

We build to your local standard — 220/380/415 V and 50/60 Hz — and provide the matching certificates.

Can you build a complete production line?

We can. Send your product drawings and target output, and our engineers will propose a layout with a full equipment list.

Are spare parts included?

Every machine includes a documented spare-parts kit and wear-parts list, with express shipping available for urgent items.

What is the typical lead time?

Standard models ship in 20-30 days. Customised lines take 45-60 days depending on the degree of automation.

Do you provide installation and training?

Yes. Two engineers travel for on-site installation, commissioning and operator training; remote support continues after they leave.

From Our Factory

A look inside our workshop, production lines and shipments.

demo-demo8-5-Loading bay demo-demo8-4-Spare parts warehouse demo-demo8-3-Packaging line trial demo-demo8-2-Laser cutting demo demo-demo8-1-Precision testing room demo-demo8-0-CNC assembly hall
News

Installing machinery overseas

Installing machinery overseas

What to plan before shipment: foundation, power, rigging, customs and the training schedule for your operators.

Read all articles →

Request a Quote

Tell us what you need. Our sales engineer replies within 8h.

We only use your details to reply to this inquiry. No spam.